
Project Information
PROJECT YEAR | 2019 |
CLIENT |
TELAS KAUÇUK |
TOTAL CONSTRUCTION AREA |
48.218,00 m² |
The project of Telas Kauçuk, which has a closed area of approximately 48.218,00 square metres, designed by Giza Architecture, was completed in 2019. Telas Lastik Sanayi ve Ticaret A.Ş. began operations in Topkapi in 1981 with two hand presses, two compression presses, and one 40-liter dough machine. It moved to its current manufacturing location in the Ikitelli Organized Industrial Zone, which comprises of three buildings with a closed area of 13.500 m2, in 1995, as its production operations and capacity grew.


